WUOT Tower Construction

Future Home of WUOT's Transmitter… a work in progress

Photos from: Mid & Late Nov. 02 | Dec. 02 |Mar. 03 |Apr. 03

Movies

Photos from the tower/transmitter site
Just starting...photos taken 11/11/02:

 

From 11/13/02....

 

From 11/14/02...

 

Photos from November 22, 25 and 26....


Mud...


and more mud


Guy wire end cable is 2 1/4" diameter


Looking up at 260' of tower


Under wood are strobes; red lights will flash as site beacons.


Ladder is 10-feet-tall


Work halted on roof due to stacking tower sections. Safety first.

 

Photos from December 10....


Tower at 440 feet


Putting the roof on


New transmitter building finished. Photo taken October 2006.

PHOTOS TAKEN MARCH 2003…


Tower as of March 5, 2003


Top of tower


Tower base with framing for new stairs. Our building is on the right.


Close up of guy anchor base


Tower top and candelabra


Candelabra arms. Check out their size compared to the full size truck beside them.


Tower Platform


Close-up view of platform

Photos from early April:


Yes, that IS a crane atop the tower. Tower height is at about 1500'.


New platforms are put in place for future equipment.


One of the candelbara arms. Notice its size compared to the car.

 

Photos from April 15:


New candelabra top being set in place.


More tower parts being lifted to the top for installation.


New guy wires attached at the top and waiting to be connected to support the new top.


Close up shot of parts arriving at top and a better picture of the arms in place.


Distant shot showing the nearly completed top of the tower including the crane.

Request Show - first Friday
of each month
SUBMIT A REQUEST

STATION TOUR
Take a photographic tour of WUOT's studio

 

More about
WUOT’s Tower Construction

Project details

Photos from 9/03

Photos from 11/02 - 4/03

Photos from 12/03-2/04

Movie Clips

Movie clips from the tower construction site, (please note that these are large files and it may take some time to download)

Clips from 11/11/02

#1, #2, #3, #4, #5, #6, #7, #8

From 11/22/02 thru 11/26/02:

#9 -- Hoisting tower crane to lift new sections into place

#10 -- Raising tower section

#11 -- Standing tower section up for lifting into place

#12 -- Hoisting tower from ground

#13 -- Tower at base of crane

#14 -- Hoisting tower section to top of crane

#15-- Swinging tower in place (3 crewmen physically push the tower around and into place)

#16 -- Putting tower in place

#17 -- Starting to bolt new section in place

Movies from 9/03:

#18 , #19 , #20 , #21 , #22 , #23, #24, #25 , #26 , #27 , #28